Inclusive design for people of determination
Step-free routes, wide doors, accessible washrooms and clear guidance, built in from the start.

Inclusive design makes buildings usable by everyone, including people of determination.
Core provisions
- Step-free routes, ramps with proper gradients and handrails.
- Doors and corridors wide enough for wheelchairs, and lifts where levels change.
- Accessible washrooms and parking close to entrances.
- Tactile and visual guidance, clear signage and good lighting.
Why design early
Retrofitting is costly and awkward; building it in costs little and benefits parents with prams, elderly people and everyone else.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Architectural Design


