Architecture
Mosque design: qibla, acoustics, light and ablution
Qibla, acoustics, light and ablution: the principles behind a well-designed mosque.

A mosque is designed around orientation, sound, light and ritual cleansing.
- Qibla: the prayer hall is aligned precisely, and the layout of rows follows it.
- Acoustics: a clear voice from the imam without echo, using absorbent finishes and controlled ceiling geometry.
- Light: soft, shaded daylight without glare on the qibla wall.
- Ablution: washing areas close to the entrance with non-slip floors and good drainage.
- Separation and access: separate entrances and areas where needed, with accessible routes.
- Cooling: quiet, evenly distributed air conditioning, as the hall is used at peak times.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Architectural Design


