As-built drawings: the document you will need years later
The document you will need years later: what as-built drawings show and why to require them before final payment.

As-built drawings record what was actually built, which often differs from what was drawn.
Why they matter
They show where pipes and cables run inside walls, how the structure was finally built, and where services were changed on site. You will need them for renovations, repairs, extensions and sale.
What to require
As-built drawings for every discipline, delivered before final payment and reviewed by your supervising engineer against the site.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Engineering Supervision

