Commercial & industrial

Steel canopies: petrol stations, car parks and entrances

Wind loads, span, drainage and corrosion protection for steel canopies.

Arkan engineering team 2 min read

Steel canopies cover petrol stations, car parks and entrances.

Design points

Wind loads, span and column placement, drainage, corrosion protection and connection details.

Coordination

Lighting, signage and fire systems must be planned with the structure.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Structural Engineering