Interior design

Curtains and sun control: comfort and AC savings

Layered curtains plus external shading for comfort and lower air-conditioning use.

Arkan engineering team 2 min read

Curtains control glare, privacy and heat.

  • Blackout layers for bedrooms.
  • Light fabrics for daytime privacy.
  • Motorised options for large windows.

Combine with external shading for the best energy savings.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Interior Design