Commercial & industrial

Labour accommodation: space, ventilation and safety requirements

Space, ventilation, sanitation and fire safety: requirements for labour accommodation.

Arkan engineering team 2 min read

Labour accommodation must meet space, ventilation and safety requirements.

  • Minimum area per person and proper room layout.
  • Natural light, ventilation and air conditioning.
  • Adequate washrooms, kitchens and laundry.
  • Fire safety, exits and alarms.
  • Approval from the relevant authority.

Good design supports health and productivity.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Architectural Design