Setbacks: why drawings get rejected over one metre
One metre can sink a submission. Common setback violations and how to prevent them.

A single metre can get a drawing rejected. Setbacks protect light, privacy, fire safety and access.
Common violations
- Balconies, stairs or canopies projecting into the setback.
- Boundary walls and gates exceeding permitted height.
- Annexes or extensions that cross the setback line.
- Mismatch between the plot plan and the drawing's boundary dimensions.
Prevention
Confirm the setbacks from the plot document, draw them on every plan, and check every projecting element before submission.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Architectural Design

