Cost & contracts

Feasibility of an investment building: from plot to yield

Will the building deliver the return required? Components, indicators and the consultant's role in a feasibility study.

Arkan engineering team 2 min read

Before buying land or designing an investment building, answer in numbers: will it deliver the return required?

The study covers

  • Plot regulations: permitted use, ratios, floors, setbacks, parking.
  • Net lettable area after circulation and services.
  • Unit mix suited to local demand.
  • Construction cost, fees and approvals.
  • Expected rent, realistic occupancy and operating costs.

Indicators

Gross and net yield, payback and sensitivity to cost or rent changes.

The consultant's role

Test the maximum use of the plot, estimate cost realistically and propose the best unit mix, so the decision rests on numbers.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Project Management