The internal staircase: feature or structural headache?
A staircase is both a feature and a structural element. Comfort, safety, structure and position.

The internal staircase is a design feature and a structural element, and both aspects need attention.
Comfort and safety
Comfortable riser and tread proportions, adequate width, landings where needed and a handrail at the correct height.
Structure
A floating or cantilevered stair needs a specific structural design, and an opening in the slab changes beam layout.
Position
Place the stair where it organises circulation, not where space is left over. Light from above makes it a feature.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Architectural Design


