Villa design

Two kitchens, not one: designing inner and outer kitchens

Two kitchens rather than one: roles, ventilation and access for inner and outer kitchens.

Arkan engineering team 2 min read

Many Emirati homes use two kitchens for good reasons.

The inner kitchen

Where the family cooks and eats daily: clean, finished to the same standard as the living areas, and close to the dining space.

The outer kitchen

For heavy cooking and catering for gatherings, with strong ventilation, durable finishes and a service entrance.

Design points

  • Separate extraction for each kitchen.
  • Easy access from the outer kitchen to the majlis and the service door.
  • Durable, washable surfaces and generous storage.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Interior Design