Villa design

Renovating an old villa: what to renew and what to rebuild

Assess first: what to renew, what to repair and when rebuilding is wiser.

Arkan engineering team 2 min read

Renovating an old villa begins with an assessment.

Assess

Structure, waterproofing, services and any defects.

Decide

What to renew (finishes, services), what to repair (structure) and what to rebuild if the condition is poor.

Permit

Many renovations need a permit, especially structural changes or additions.

Budget

Include a contingency, because hidden conditions appear when walls are opened.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Architectural Design