A lift in your villa: when it is worth it and what the design needs

When a home lift is worth it, and why to reserve the shaft in the structure from the beginning.

Arkan engineering team 2 min read

A home lift suits families with elderly members, large houses and future-proofing.

What the design needs

A shaft with the right dimensions, a pit, overhead clearance and a machine solution, plus dedicated power.

When to include it

When you build three levels, when mobility is a concern, or when the lift opening can be reserved for later installation.

Reserve it early

Allow for the shaft in the structure even if you install the lift later; adding a shaft afterwards is expensive.