Villa design
Car park shades: steel or fabric?
Steel or fabric: durability, cost, wind resistance and approvals for car park shades.

Car park shades protect vehicles and cut interior heat.
Steel or fabric?
- Steel and sheet: durable, higher cost, good for permanent cover.
- Tensile fabric: light and attractive, requires maintenance and replacement.
Design points
Height for tall vehicles, wind resistance, drainage and approval where required.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Structural Engineering

