Villa design

The inner courtyard: a heritage idea that solves modern problems

A heritage idea that brings light, air and privacy: how to design a courtyard villa.

Arkan engineering team 2 min read

The inner courtyard, a heritage idea, solves several modern problems.

Benefits

Natural light and ventilation into inner rooms, privacy without blank walls and a shaded outdoor space for the family.

Design

Shade with overhangs and planting, water features for cooling and clear connections to the living areas.

Cost

A courtyard adds perimeter and facade area, but often reduces dependence on artificial light and air conditioning.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Architectural Design