Majlis design: size, light, acoustics and ventilation
Four decisions that make a majlis comfortable: size, light, acoustics and air.

The majlis is the most public room in the house and the one guests judge it by. Four things decide whether it works.
Size
Plan seating for your largest regular gathering with comfortable circulation; a room that is too large feels empty on ordinary days.
Light
Soft natural light from high or shaded windows avoids glare. Layered artificial light (ambient, wall and accent) makes the room flexible from daytime to late evening.
Acoustics
Hard surfaces make conversation tiring. Carpets, upholstery, fabric panels and a well-detailed ceiling absorb sound.
Ventilation and air conditioning
Cool air must reach the seating without blowing on guests, and the room needs fresh-air exchange for large groups.
Access
A dedicated entrance, nearby washroom and a service route from the kitchen keep hospitality smooth and family areas private.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Interior Design


