Villa design

The guest washroom: small but it says everything

Small but highly visible: position, layout and finishes for a guest washroom.

Arkan engineering team 2 min read

The guest washroom is small but highly visible.

Position

Near the majlis but not opening onto it.

Layout

Separate the basin area from the toilet, and provide space for hand washing before meals.

Finishes

A feature material in small quantity, warm indirect lighting and quiet ventilation.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Interior Design