Villa landscaping: native plants, efficient irrigation, real shade
Native plants, efficient irrigation and real shade: designing a garden that does not drain water or budget.

A garden can be the best or the costliest part of a villa, depending on design.
Start with use and shade
Decide how the family will use the garden, then provide shade for those uses.
Choose suitable plants
Native and adapted species use less water. Limit turf to areas that are actually used.
Irrigation
Drip irrigation and smart timers, with pipes installed before paving.
Details
Warm lighting, outdoor power and water points, and drainage away from the building.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Architectural Design


