Supervision & construction
Plot survey and setting out: the first step on site
Boundaries, axes, levels and setbacks, verified and documented before digging.

The first work on site is setting out.
- A licensed surveyor fixes the boundaries.
- Building axes are marked outside the excavation.
- Levels are set relative to the road and neighbours.
- Verify setbacks against the permit and document it.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Engineering Supervision


