Structural engineering

Building settlement: causes, signs and remedies

Weak soil, poor compaction or leaks: treat the cause before repairing cracks.

Arkan engineering team 2 min read

Settlement comes from weak soil, poor compaction, leaks washing out soil or changed loads.

Signs: diagonal cracks, sticking doors and sloping floors. Investigate and treat the cause before repairing the cracks.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Structural Engineering