ETABS, SAFE and SAP2000: what structural engineers do with them
Software models and analyses; the engineer's judgement and checks decide.

ETABS, SAFE and SAP2000 model the structure and loads.
Engineers use them to analyse behaviour, then check and detail the design. The software is a tool; judgement and checks matter more.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Structural Engineering


