MEP & sustainability
Backup power: when you need a generator or UPS
Generator for long outages, UPS for instant short backup: size to critical loads.

- Generator: for long outages and heavy loads.
- UPS: instant power for sensitive equipment for short periods.
Decide which loads are critical, size accordingly and test regularly.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Electrical Engineering

