Home EV charger: plan for it now
Conduit, board capacity and load allowance during construction make EV charging cheap to add.

Preparing for an EV charger during construction costs little.
- Provide a conduit or cable to the parking area.
- Leave capacity in the main board.
- Include the load in the schedule and utility request.
- Choose a protected, correctly rated wall charger installed by a qualified electrician.