The master suite: bedroom, dressing and bath as one design
Bedroom, dressing and bath as one design: layout, storage, ventilation and comfort.

The master suite works best when bedroom, dressing and bathroom are designed together.
Layout
Place the bath and dressing between the bedroom and the entrance so sound and light do not intrude on sleeping.
Dressing
Plan storage by what you own, with lighting and ventilation.
Bathroom
Good ventilation, waterproofing and separate wet and dry zones.
Comfort
Blackout and sun control, good insulation and a quiet air-conditioning position.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Interior Design


