Villa design

Façade materials that survive the UAE climate

Which facade materials survive UAE sun, salt and dust, and why detailing matters as much as the material.

Arkan engineering team 2 min read

Facade materials face sun, salt, dust and humidity.

Good performers

Quality render with suitable paint, natural stone, porcelain cladding and well-detailed aluminium.

Detailing matters

Drip edges, movement joints and sealing at interfaces determine durability more than the brand.

Maintenance

Choose materials that you can clean and repaint easily, and specify them clearly.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Architectural Design