How many revisions does a villa design need, and how to avoid costly ones
Revisions are cheap at concept stage and expensive after permit. How to reduce costly ones.

Revisions are natural in design, but their cost depends on timing.
Cheap
At concept design, in 3D review and before technical drawings.
Expensive
After technical drawings and permit submission, and especially during construction.
Reduce revisions
Write your needs in advance, involve decision-makers from day one, review carefully and sign off each stage.