Supervision & construction
External works: paving, drainage and lighting
Kerbs, compacted bases, drainage falls and conduits before paving.

External works come last, but are seen first.
- Secure kerbs on a concrete base at correct levels.
- Compacted base under paving suited to loads.
- Falls to drainage away from the building.
- Lay conduits for lighting and irrigation before paving.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Engineering Supervision

