MEP & sustainability
Water leaks at home: early signs and how to find the source
Rising bills, damp patches and a meter that moves with taps off: finding hidden leaks.

Early signs: rising water bills, damp patches, musty smell and paint bubbling.
- Check the meter with all taps off.
- Inspect under sinks and around tanks.
- Use a professional leak detector for hidden pipes.
Fix quickly to avoid structural damage.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Mechanical Engineering


