Structural engineering
Cantilevers and balconies: architectural flair with special requirements
Top reinforcement, anchorage and deflection: what a cantilever needs.

Cantilevers carry all their load at one end.
- Main steel goes in the top face and anchors deep in the slab.
- Check deflection as well as strength.
- Support top steel on chairs during the pour.
- Provide waterproofing, drainage falls and a drip groove.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Structural Engineering

