Structural engineering
Blockwork: details that prevent cracks later
Mortar beds, bond, control joints and connections prevent later cracks.

- Solid beds of mortar, staggered joints and straight lines.
- Control joints where required.
- Proper connection to columns and slabs.
- Fill gaps below beams after settlement.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Engineering Supervision


