
Documents you should receive with your keys
As-built drawings, certificates, warranties, manuals and photo archive.
2 min read
Construction stages on site, inspections, quality and what owners and consultants should check.

As-built drawings, certificates, warranties, manuals and photo archive.
2 min read

Resident for large or complex projects, periodic for a typical villa.
2 min read

Concrete cubes, compaction, pressure and electrical tests, with reports kept.
2 min read

Decide on time, avoid late changes and pay against certified progress.
2 min read

Report defects in writing and inspect before the period ends.
2 min read

When shoring is needed, preparation before digging and daily monitoring.
2 min read

Photograph what will be covered, with dates and locations, and keep an archive.
2 min read

Kerbs, compacted bases, drainage falls and conduits before paving.
2 min read

Reports, photos, schedule checks and agreed approval limits for owners abroad.
2 min read

Structure, damp, services and paperwork: what the engineer checks before purchase.
2 min read

Compacted base, even sand bed, edge restraints and falls prevent sinking.
2 min read

Boundaries, axes, levels and setbacks, verified and documented before digging.
2 min read