Supervision & construction

Deep excavation and shoring

When shoring is needed, preparation before digging and daily monitoring.

Arkan engineering team 2 min read

Deep excavation is among the riskiest stages.

  • Need shoring when slopes cannot be made safe or neighbours are close.
  • Before digging: soil report, service locations, neighbour records, dewatering plan.
  • During: keep equipment away from the edge, fence the area, monitor daily and avoid leaving it open.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Engineering Supervision