Supervision & construction

Tiling and marble installation: what the supervisor checks

Substrate, adhesive coverage, joints and movement joints.

Arkan engineering team 2 min read

Check:

  • Flat, clean substrate with correct falls.
  • Full adhesive coverage.
  • Consistent joints and levels.
  • Movement joints where required.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Engineering Supervision