
The internal staircase: feature or structural headache?
A staircase is both a feature and a structural element. Comfort, safety, structure and position.
2 min read
A modern smart-home villa with pool and carefully designed exterior lighting.
Villas & palacesArkan design

A staircase is both a feature and a structural element. Comfort, safety, structure and position.
2 min read

When a home lift is worth it, and why to reserve the shaft in the structure from the beginning.
2 min read

Location, waterproofing, safety and privacy: what a home pool needs to be designed properly.
2 min read