Villa design

The usable roof: an evening lounge instead of wasted space

Loads, stairs, shade and waterproofing: planning a roof terrace you will actually use.

Arkan engineering team 2 min read

A roof terrace turns wasted space into an evening lounge, if planned in design.

Decide early

Structural loads, stair access, grouping of equipment, parapet height for privacy, and shade.

Comfort

Light-coloured flooring over proper waterproofing and insulation, a pergola, outdoor power and a water point.

Drainage

Keep drains accessible, and test waterproofing before tiling.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Architectural Design