Architecture
The residential building lobby: the tenant's first impression
Durable finishes, clear wayfinding and good light make a lobby the building's first impression.

The lobby is the tenant's first impression and the building's identity.
- Generous but efficient space, with durable finishes.
- Clear reception or security point and wayfinding.
- Good lighting and acoustics.
- Easy access to lifts, mailboxes and parking.
- Maintenance in mind: materials that wear well.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Architectural Design


