Commercial & industrial
Factory design: from production line to building
Start with the production flow, then wrap the building around it.

Factory design begins with the process, not the building.
- Map the production line and material flow.
- Define loads, services and clear heights from the equipment.
- Plan safety, fire and environmental controls.
- Allow for expansion.
The building then wraps around the flow.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Architectural Design

