Commercial & industrial

Designing commercial cold and freezer rooms

Insulation, refrigeration, vapour control and backup: key points for cold and freezer rooms.

Arkan engineering team 2 min read

Cold rooms need insulation, refrigeration capacity and vapour control from day one.

  • Insulated panels with sealed joints.
  • A floor designed to avoid frost heave.
  • Refrigeration plant sized to loads and door openings.
  • Alarms, backup power and monitoring.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Mechanical Engineering