Adding a room or floor to an existing villa: do you need a permit?
Extending a villa needs a permit and an engineering check of the existing structure. Steps and why you should not start first.

Adding a room or a floor to an existing villa almost always requires a permit, and for a structural reason as well as a legal one.
Why a permit is needed
New area changes the built-up ratio, and a new floor adds load to foundations designed for the original building. The authority needs to confirm both.
What is checked
- The plot allows more built-up area or height.
- The existing structure and foundations can carry the addition.
- Setbacks and neighbours' privacy.
- Fire, electrical and plumbing impacts.
Steps
- Obtain the original drawings and permit.
- A structural assessment of the existing building.
- Design the extension and, if needed, strengthening.
- Submit for approval and receive the permit before work starts.
Do not start first
Building without a permit risks a stop-work order, fines and a completion certificate that cannot be issued. Approval first is always cheaper.