Temporary site structures: offices, labour rooms and stores

Site fence, office, stores and temporary power: planning temporary facilities for a construction site.

Arkan engineering team 2 min read

Before building starts, the site needs temporary facilities.

  • A site fence with the project board.
  • A site office for meetings and documents.
  • Stores that protect materials from sun and moisture.
  • Washrooms, drinking water and shaded rest areas.
  • Temporary power with safe wiring.

Placement

Position them so they do not obstruct works, and remove them before final external works.