Architecture
Designing small clinics: flows, privacy and hygiene
Separate flows, private rooms, sterilisation zones and early health-authority review.

Small clinics need flows, privacy and hygiene designed in.
- Separate patient and staff paths, and clean and used instruments.
- Examination rooms with hand basins and privacy.
- A sterilisation room with dirty and clean zones.
- Easy-clean finishes and suitable ventilation.
- Early review against the health authority's requirements.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Architectural Design

