Orienting your villa to the sun in the UAE: a free decision that cuts power bills
A free design decision that cuts power bills for decades: how to orient a UAE villa to the sun.

Orientation is a free decision that cuts cooling load for the life of the house, if it is made at the start.
The principles
- The west and south-west sun is the hardest to control; keep large glazing and main living rooms away from it.
- North and east facades receive gentler light, suitable for larger openings.
- Put service spaces such as stores, stairs and garages on the hot side as a buffer.
Shade works with orientation
Overhangs, recessed windows and screens reduce heat gain where orientation cannot.
The plot sets limits
Street frontage and setbacks may force a less ideal orientation. Then shading and glazing performance matter more.
Benefit
Lower electricity bills, a smaller air-conditioning plant and better comfort, with nearly no added construction cost.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Architectural Design

