Interior design

Kitchen cabinets: wood, MDF and aluminium in a humid climate

Moisture-resistant boards, aluminium or wood: choosing kitchen cabinets for a humid climate.

Arkan engineering team 2 min read

In a humid climate, material choice matters.

  • Moisture-resistant boards with sealed edges.
  • Aluminium for wet or outdoor kitchens.
  • Solid wood needs care in humidity.

Hardware and edge sealing often decide longevity more than the face material.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Interior Design