Interior design

Choosing light fittings: output, beam angle and colour temperature

Output, beam angle and colour temperature: how to choose light fittings.

Arkan engineering team 2 min read

Choose fittings on three properties.

  • Output (lumens) for brightness.
  • Beam angle for spread.
  • Colour temperature for mood: warm for living areas, neutral for work.

Prefer LED with good colour rendering and dimming where useful.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Electrical Engineering