MEP & sustainability

Energy-efficient glazing: double, reflective or low-e?

Double, reflective or low-e: glazing by orientation.

Arkan engineering team 2 min read

Glazing affects heat gain and comfort.

  • Double glazing reduces heat transfer and noise.
  • Reflective coatings cut solar gain.
  • Low-e coatings improve insulation.

Choose by orientation, with lower solar-gain glass on west and south.

Need an engineering opinion on your project?

Talk to Arkan's engineers directly — the first conversation carries no commitment. — Architectural Design