Villa construction stages from excavation to handover

Six stages from excavation to handover, each inspected before being covered.

Arkan engineering team 2 min read

From excavation to handover:

  1. Excavation and foundations.
  2. Structure floor by floor.
  3. Blockwork and services rough-in.
  4. Plaster, waterproofing and insulation.
  5. Finishes, joinery and external works.
  6. Testing, snagging and handover.

Supervisors inspect before each stage is covered.