Commercial & industrial
Commercial buildings: design that attracts tenants
Efficient floorplates, good lobbies and flexible services: design that attracts tenants.

A commercial building earns when tenants want to be in it.
- Efficient floorplates that can be divided.
- Good lobbies, lifts and parking.
- Services planned for flexible tenant fit-out.
- A mix of tenants that supports each other.
Think about leasing in design
Frontage, signage and access for each unit affect rent as much as area.
Need an engineering opinion on your project?
Talk to Arkan's engineers directly — the first conversation carries no commitment. — Architectural Design

